Tuesday, 23 March 2010

No title...

I HATE LIARS!  No details.....you know who you are

Monday, 22 March 2010

It just isn't....

..happening. With the house I mean. No floor tiled last week. Got a leaky radiator which the plumber came out and supposedly fixed ..it still leaks but only when the radiator is turned on. Was supposed to come out Friday to fix it again..... but no show.  My liason officer is on holiday until Wednesday and I can't get hold of her temporary replacement...who, by the way, is supposed to visit every day. Not seen him since last Thursday.  I've got a long list for him. Perhaps he has guesssed that and is avoiding me. I have a schedule for this week which includes the fitting of white goods tomorrow...but no way is that  happening until the floor has been prepared and the tiles laid.  Roof finally finished and saffolding down.....but the scaffolders managed to rip my phone line away from it's wall fixing so it's hanging very low. What's made me angry is that they should have reported it and didn't. The guttering is done..except the down pipe isn't connected. If we have heavy rain my neighbour's conservatory will get the full blast of that. The rear security light isn't working and the back door has to be slammed shut to be able to lock it....my neighbours will love that...NOT!!!!! .(young children and shift work)..and....I now have a leaking kitchen radiator, and a very fast dripping hot water tap in the kitchen. The decorator has turned up and almost finished. He would have finished today except the patch plasterer decided to turn up after the painting was done. Other than that everything is hunky dory. Well not really but I'm trying to look on the bright side..having trouble seeing that at the moment.  I've had enough now..want it finished and done with. Can't get my stuff out of storage until the work has been signed off, and that just seems so far away at the moment with all the niggling little things that need sorting. Somebody needs to pull their finger out and get the job done.

Wednesday, 17 March 2010

Work has come to a halt....

..again!  Plaster patch was supposed to be on Monday.......decorating the kitchen and bathroom yesterday and today.......floor prepared for flooring Thursday and laid Friday. yesterday had a couple of blokes come and replace 3 radiators that were taken off when plastering was done, and the loft insulation was finally done...only 3 weeks late. I'm still waiting for a plumber to repair a very small leak on the upstairs toilet....not a major job but I can see it becoming one if it isn't repaired very soon. Still got the scaffolding up....got a new roof and facias but no gutters..just hope it doesn't rain. The really anoying thing is I'm getting up at 6.30 every morning to be ready for the work to be started at 8 oclock, and no one is turning up! I could have stayed in bed and got some much needed rest. It's really taking it's toll now..I'm very tired and in a lot of pain. My hands are very swollen and walking upstairs is extremely difficult and painful.....I'm almost crawling up them.
I haven't been able to spend too long on the computer, hence my absence visiting all you lovely bloggers out there. Hopefully I will be able catch up soon.

Tuesday, 9 March 2010

House update...

Finally..work has been done on the house. The roof is almost finished.... I have half a kitchen....and a complete bathrom with bath, toilet and power shower. Also got a new downstairs toilet with small handbasin and radiator fitted.  I should have skirting boards and internal doors by Friday (no bedroom doors at the moment and downstairs doors don't shut 'cos they don't fit new frames) It means another week of getting up at 6.30 and I'm exhausted by the early evening....very early nights for me. Not that I'm actually doing much.....you can't when you have workmen all over the house...just moving boxes from one room to another when they need room to work. Right..I'm off  for a bath and then bed. Night all.

Saturday, 6 March 2010

More problems with the house....

......the chimney breast needs plasterboarding and skimming again.....it isn't flush with the new gas fire that will be installed. This was supposed to be done on Wednesday but no plasterers showed. New gas supposed to be fitted Thurday and the first inspection due....again no show. Friday all the plumbing was to be completed ready for the downtairs toilet and kitchen refit which should have started ..guesss what?...NO SHOW!!!!! That's 3 mornings I needn't have got up at 6.30...I don't do mornings and all this early rising is really taking it's toll. Got some good news though.....my new roof is finally being put on. They say it should be finished by Tuesday and then the scaffolding can come down. The neighbours will be happy about that..it's knocked out their sky. Had a lovely lie in this morning as well......bliss. Not counting on anything going  right at the moment.....it's Sod's Law...if it can go wrong ..it will.  Even the keyboard is playing up...press the space bar or any punctuation keys and it deletes....